| 25JE0034
|
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD, NRJ BARANGAY POBLACION- BARANGAY SAN FERNANDO- BARANGAY BAMBONG DIUT- BARANGAY BAGONG OPON- BARANGAY MALATING, RAMON MAGSAYSAY, ZAMBOANGA DEL SUR |
RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R (22901) |
Region IX - Zamboanga Peninsula
|
₱29,372,549.13 |
On-Going
|
|
215 days
|
|
| 25JE0032
|
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD, NRJ BARANGAY DITULAN- BARANGAY GUINTANANAN- BARANGAY CANIBONGAN- BARANGAY MALAGALAD- BARANGAY MACASING- BARANGAY TAMURAYAN- NRJ VALENCIA BYPASS, DUMINGAG, ZAMBOANGA DEL SUR |
JZL BUILDERS & ENTERPRISES (43854) |
Region IX - Zamboanga Peninsula
|
₱29,379,997.31 |
On-Going
|
|
220 days
|
|
| 25JE0025
|
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALONG SALUG DAKU RIVER, BARANGAY TUMAPIC, MAHAYAG, ZAMBOANGA DEL SUR |
MJMARI BUILDERS AND DEVELOPMENT CORPORATION (FORMERLY: MJMARI BUILDERS AND ENTERPRISES) (36434) |
Region IX - Zamboanga Peninsula
|
₱48,200,000.00 |
On-Going
|
|
228 days
|
|
| 25JE0023
|
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD, DUMINGAG- KATIPUNAN ROAD, NRJ BARANGAY UPPER LANDING- BARANGAY DILUD- BARANGAY SAAD- BARANGAY KATIPUNAN, DUMINGAG, ZAMBOANGA DEL SUR |
SEVERS CONSTRUCTION & SUPPLIES & REALTY DEVELOPMENT (41004) |
Region IX - Zamboanga Peninsula
|
₱29,349,997.22 |
On-Going
|
|
190 days
|
|
| 25JE0018
|
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD, NRJ BARANGAY POBLACION- BARANGAY LIBERTAD- BARANGAY SANTO NIÑO- BARANGAY LUMANGOY- BARANGAY SAWA- BARANGAY BINAYAN, LABANGAN AND SOMINOT, ZAMBOANGA DEL SUR |
NRMM CONSTRUCTION AND DEV'T CORP. (41172) |
Region IX - Zamboanga Peninsula
|
₱29,384,427.42 |
On-Going
|
|
190 days
|
|
| 25JE0012
|
BIP- MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI- PURPOSE BUILDING, ZAMBOANGA DEL SUR |
KS AGAD CONSTRUCTION (41208) |
Region IX - Zamboanga Peninsula
|
₱14,839,035.63 |
On-Going
|
|
230 days
|
|
| 25JE0011
|
CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, NRJ TO BRGY. UPPER TIMONAN- MARANGAN- KAHAYAGAN- PALILI- TIMBABOY IN SUPPORT OF ABACA HANDICRAFT PROCESSING, MIDSALIP, ZAMBOANGA DEL SUR |
JAMRAY BUILDERS AND ENTERPRISES (44297) |
Region IX - Zamboanga Peninsula
|
₱4,894,087.65 |
On-Going
|
|
150 days
|
|
| 25JE0008
|
BIP- MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI- PURPOSE BUIDLING, MAHAYAG, ZAMBOANGA DEL SUR |
ILMW CONSTRUCTION & ENTERPRISES (41704) |
Region IX - Zamboanga Peninsula
|
₱14,840,304.96 |
On-Going
|
|
150 days
|
|
| 25JE0029
|
SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239:INSTALLATION/ APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG PAGADIAN CITY AIRPORT RD.- K1664+(-687)- K1664+260, K1664+(-890)- K1664+(-687), K1664+(-960)- K1664+(-890) |
ZMS CONST. & DEV. CORP. (FORMERLY:ZMS CONSTRUCTION (10471) |
Region IX - Zamboanga Peninsula
|
₱9,790,001.69 |
Suspended
|
|
130 days
|
|
| 25JE0016
|
BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF ROAD, BARANGAY KAGAWASAN, PAGADIAN CITY, ZAMBOANGA DEL SUR |
GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS) (18052) |
Region IX - Zamboanga Peninsula
|
₱9,895,608.10 |
Completed
|
|
70 days
|
|
| 25JE0010
|
SUSTAINABLE INFASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD, BARANGAY NANGAN- NANGAN- BARANGAY LISON VALLEY- BARANGAY LOURDES- BARANGAY LOWER SIBATANG- NRJ BARANGAY MACASING, TIGBAO AND PAGADIAN CITY, ZAMBOANGA DEL SUR |
ZMS CONST. & DEV. CORP. (FORMERLY:ZMS CONSTRUCTION (10471) |
Region IX - Zamboanga Peninsula
|
₱39,174,545.59 |
On-Going
|
|
215 days
|
|
| 25JE0009
|
BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF ROAD, BARANGAY LUMAD, PAGADIAN CITY, ZAMBOANGA DEL SUR |
ZMS CONST. & DEV. CORP. (FORMERLY:ZMS CONSTRUCTION (10471) |
Region IX - Zamboanga Peninsula
|
₱9,890,026.10 |
On-Going
|
|
90 days
|
|
| 25JE0003
|
CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS NRJ PAGADIAN CITY- ZAMBOANGA CITY ROAD LEADING TO PALPALAN PEAK, PAGADIAN CITY, ZAMBOANGA DEL SUR |
GAF TRADING & CONSTRUCTION (32865) |
Region IX - Zamboanga Peninsula
|
₱9,795,000.00 |
Suspended
|
|
90 days
|
|
| 25JE0002
|
BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF ROAD, BARANGAY DATAGAN, PAGADIAN CITY, ZAMBOANGA DEL SUR |
ZMS CONST. & DEV. CORP. (FORMERLY:ZMS CONSTRUCTION (10471) |
Region IX - Zamboanga Peninsula
|
₱9,890,017.38 |
On-Going
|
|
90 days
|
|
| 25JE0001
|
BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF ROAD, BARANGAY DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR |
ZMS CONST. & DEV. CORP. (FORMERLY:ZMS CONSTRUCTION (10471) |
Region IX - Zamboanga Peninsula
|
₱4,944,885.97 |
Completed
|
|
50 days
|
|
| 25C00500
|
ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF BULACAN |
L.R. TIQUI BUILDERS, INC. (13810) / M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201) |
Region III - Central Luzon
|
₱114,110,872.20 |
On-Going
|
|
300 days
|
|
| 25C00476
|
ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA |
ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400) / TRIPLE S BUILDERS INC. (43634) |
Region III - Central Luzon
|
₱284,091,458.86 |
On-Going
|
|
319 days
|
|
| 25C00509
|
CONVERGENCE & SPL. SUPPORT PROG.-CONST./IMPR'VT. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NAT'L. SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROG.-TIKAS) CONST. OF ZNH PERSONNEL QUARTERS, NLSG, SAN ANTONIO, ZAMBALES, PROV. OF ZAMBALES |
KAEE CONSTRUCTION SERVICES (46367) |
Region III - Central Luzon
|
₱28,676,245.30 |
Not Yet Started
|
|
240 days
|
|
| 25C00514
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BUILDING, SAN VICENTE, SANTA MARIA, BULACAN, PROVINCE OF BULACAN |
M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684) / 3AMR CONSTRUCTION SERVICES INC.(FORMERLY: 3AMR CONSTRUCTION SERVICES) (48233) |
Region III - Central Luzon
|
₱49,019,115.04 |
Not Yet Started
|
|
360 days
|
|
| 25BK0105
|
BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. MARIA, MADDELA, QUIRINO |
A.P.D. CONSTRUCTION, INC. (FORMERLY: APD CONSTRUCTION) (17467) |
Region II - Cagayan Valley
|
₱38,402,477.96 |
Not Yet Started
|
|
339 days
|
|
| 25BK0085
|
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONCTROL (STO. NIÑO SECTION), MADDELA, QUIRINO |
JMD-68 BUILDERS (36943) |
Region II - Cagayan Valley
|
₱28,081,383.72 |
Completed
|
|
211 days
|
|
| 25BK0080
|
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL UPSTREAM (PONGGO SECTION), NAGTIPUNAN, QUIRINO |
AJN24 CONSTRUCTION (51084) |
Region II - Cagayan Valley
|
₱27,559,786.30 |
Completed
|
|
211 days
|
|
| 25BK0046
|
SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG CORDON - AURORA BDRY RD (ISABELA BDRY - JCT DUMABATO) - KO339+000 - K0345+338, CABARROGUIS AND AGLIPAY, |
JHUERS CONSTRUCTION (51171) |
Region II - Cagayan Valley
|
₱29,254,157.92 |
Completed
|
|
122 days
|
|
| 25BK0045
|
SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG CORDON - AURORA BDRY RD (ISABELA BDRY - JCT DUMABATO) - K0322+(-730) - K0339+000, K0360+000 - K0360+542, |
PACIFIC18 CONSTRUCTIONS INCORPORATED (50264) |
Region II - Cagayan Valley
|
₱29,253,198.96 |
Completed
|
|
122 days
|
|
| 25BI0011
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS WATER SUPPLY SYSTEM CONSTRUCTION OF WATER SYSTEM FOR BAROBBOB MASOC TO RESERVOIR LUYANG, BAYOMBONG, NUEVA |
E.M. BAYATAN CONSTRUCTION (21332) |
Region II - Cagayan Valley
|
₱24,230,580.00 |
Completed
|
|
200 days
|
|
| 25BI0017
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM CONSTRUCTION OF SAN FERNANDO FLOOD CONTROL STRUCTURE ALONG |
R.O. BUILDERS & DEVELOPMENT CORPORATION (22393) |
Region II - Cagayan Valley
|
₱48,127,425.03 |
Completed
|
|
226 days
|
|
| 25BI0036
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT |
DALCON CONSTRUCTION (40601) |
Region II - Cagayan Valley
|
₱143,305,680.55 |
Completed
|
|
338 days
|
|
| 25BI0020
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE ALONG |
DALCON CONSTRUCTION (40601) |
Region II - Cagayan Valley
|
₱95,421,356.35 |
Completed
|
|
320 days
|
|
| 25BI0014
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF BARETBET STA. LUCIA (SITIO DISSU) |
JANN-NORRIS CONSTRUCTION AND SUPPLIES INC. (FORMELY: JANN-NORRIS CONSTRUCTION AND SUPPLIES) (35880) |
Region II - Cagayan Valley
|
₱95,446,415.09 |
Completed
|
|
320 days
|
|
| 25BA0073
|
BIP- MULTIPURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI-PURPOSE BUILDING (SABTANG MUNICIPAL BUILDING), PHASE II, BARANGAY SINAKAN, SABTANG, BATANES |
ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC. (32073) / SWIFT DEVELOPMENT AND SUPPLIES CORP. (44778) |
Region II - Cagayan Valley
|
₱28,863,367.03 |
On-Going
|
|
291 days
|
|
| 25BA0039
|
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/ NEW ROADS: SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD, CHAVAYAN, PACKAGE 1, BATANES |
MOJR CONSTRUCTION AND DEVELOPMENT CORPORATION (38443) / RED MOLE CONSTRUCTION (15710) |
Region II - Cagayan Valley
|
₱49,862,615.30 |
On-Going
|
|
360 days
|
|
| 25BA0028
|
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/ NEW ROADS: SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD, SUMNANGA, PACKAGE 2, BATANES |
J.H.R. ENTERPRISES (39894) / SWIFT DEVELOPMENT AND SUPPLIES CORP. (44778) |
Region II - Cagayan Valley
|
₱48,974,733.34 |
On-Going
|
|
360 days
|
|
| 25BA0015
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS- FLOOD MANAGEMENT PROGRAM:CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF GUARDWALL ALONG AIRPORT-MAUYEN PORT ROAD, ITBAYAT, BATANES |
J.F. GABOTERO, INC. (49240) / CDU CONSTRUCTION (13915) |
Region II - Cagayan Valley
|
₱48,979,540.13 |
On-Going
|
|
364 days
|
|
| 25BA0005
|
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS: BASCO- MAHATAO- IVANA- UYUGAN- IMNAJBU ROAD- K0011+760-K0011+791 |
REBTRADE INTERNATIONAL CORPORATION (36213) |
Region II - Cagayan Valley
|
₱48,501,170.20 |
On-Going
|
|
358 days
|
|
| 25B00015
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MANILA NORTH RD - K0654+387.30 - K0655+046 |
JANN-NORRIS CONSTRUCTION AND SUPPLIES INC. (FORMELY: JANN-NORRIS CONSTRUCTION AND SUPPLIES) (35880) / J.G. YACAS CONSTRUCTION, SUPPLY AND EQUIPMENT RENTAL (43632) |
Region II - Cagayan Valley
|
₱125,395,595.38 |
On-Going
|
|
223 days
|
|
| 25B00022
|
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO - SOLANA DIVERSION ROAD (TUGUEGARAO - SOLANA BRIDGE AND APPROACHES), PACKAGE 2, CAGAYAN |
DOUBLE J1908 CONSTRUCTION (44337) |
Region II - Cagayan Valley
|
₱141,706,325.34 |
On-Going
|
|
329 days
|
|
| 25B00028
|
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGE - MINANGA BR. (B01129LZ) ALONG MAHARLIKA HIGHWAY |
EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722) |
Region II - Cagayan Valley
|
₱241,150,001.36 |
On-Going
|
|
478 days
|
|
| 25B00029
|
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - CLAVERIA VIADUCT ALONG MAHARLIKA NORTH RD |
R.D. INTERIOR JUNIOR CONSTRUCTION (6483) / SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC. (14174) |
Region II - Cagayan Valley
|
₱282,757,606.91 |
On-Going
|
|
448 days
|
|
| 25B00047
|
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MALALAM BR. (B01121LZ) ALONG MAHARLIKA HIGHWAY |
DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY (39808) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722) |
Region II - Cagayan Valley
|
₱253,509,603.37 |
On-Going
|
|
420 days
|
|
| 25AF0006
|
CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCTURES ALONG ARINGAY RIVER BASIN, PACKAGE 11, TUBAO, LA UNION |
UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES (35079) |
Region I - Ilocos Region
|
₱96,492,047.79 |
On-Going
|
|
275 days
|
|
| 25AF0096
|
CONST/UPGRADING/REHAB OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD, K0261+921 - K0262+102, BAUANG, LA UNION |
UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP. (49389) |
Region I - Ilocos Region
|
₱56,165,616.62 |
Completed
|
|
197 days
|
|
| 25AF0084
|
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. GANA, CABA, LA UNION PACKAGE 2, BRGY. GANA, CABA, LA UNION |
E.E. MADAYAG CONSTRUCTION (25029) |
Region I - Ilocos Region
|
₱48,245,407.51 |
Completed
|
|
196 days
|
|
| 25AF0053
|
CONST/REHAB OF FLOOD CONTROL MIT. FACILITIES W/IN MAJOR BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG BAUANG RIVER BASIN, PACKAGE 1, BRGY. GUSING NORTE, NAG. LU |
VILLAR GENERAL CONSTRUCTION AND SUPPLIES (22540) |
Region I - Ilocos Region
|
₱46,802,501.17 |
Completed
|
|
187 days
|
|
| 25AF0052
|
CONST./MAINT. OF FLOOD MIT. STRUC. & DRAINAGE SYS. - CONST. OF FLOOD CONTROL STRUC. ALONG ARINGAY RIVER BASIN. BRGY. POBLACION, ARINGAY. LA UNION |
JWU CONSTRUCTION AND SUPPLY (48659) |
Region I - Ilocos Region
|
₱96,497,916.51 |
Completed
|
|
210 days
|
|
| 25AE0039
|
PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN FERNANDO - BAGULIN RD - K0283+000 - K0284+550 |
MG SAMIDAN CONSTRUCTION (33234) |
Region I - Ilocos Region
|
₱47,306,501.17 |
On-Going
|
|
107 days
|
|
| 25AE0048
|
BASIC INFRASTRUCTURE PROGRAM (BIP) - REPAIR/REHABILITATION OF BANK SLOPE PROTECTION, ALONG BOROBOR RIVER (RIMOS NO. 5 SECTION), BARANGAY RIMOS NO. 5, LUNA, LA UNION |
ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908) |
Region I - Ilocos Region
|
₱43,442,285.98 |
On-Going
|
|
268 days
|
|
| 25AE0070
|
BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE FACILITIES INCLUDING SITE DEVELOPMENT, SAN FERNANDO, LA UNION (RE-ADVERTISEMENT) |
OCTAGON CONCRETE SOLUTIONS INC. (34475) |
Region I - Ilocos Region
|
₱144,044,907.29 |
On-Going
|
|
360 days
|
|
| 25AE0016
|
SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG SN FERNANDO-BAGULIN RD - K0271+000 - K0271+905, K0272+828 - K0280+000 |
UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES (35079) |
Region I - Ilocos Region
|
₱24,469,442.43 |
Completed
|
|
100 days
|
|
| 25AE0015
|
SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MANILA NORTH RD - K0279+800 - K0283+720 |
TSAI SHEN CONSTRUCTION (54252) |
Region I - Ilocos Region
|
₱24,467,938.18 |
Completed
|
|
100 days
|
|
| 25AD0047
|
SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REPLACEMENT OF BRIDGE, NANGUNEG WEST BRIDGE, NARVACAN, ILOCOS SUR |
SATRAP CONSTRUCTION CO., INC. (02526) |
Region I - Ilocos Region
|
₱112,315,741.91 |
On-Going
|
|
256 days
|
|
| 25AD0046
|
INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MANILA NORTH ROAD -K0383+000-K0386+419 |
EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722) |
Region I - Ilocos Region
|
₱51,471,602.30 |
On-Going
|
|
120 days
|
|
| 25AD0042
|
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, STA. 0+000 - STA. 0+780, SUGPON, ILOCOS SUR |
FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. (11645) |
Region I - Ilocos Region
|
₱74,883,461.31 |
On-Going
|
|
234 days
|
|
| 25AD0048
|
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD PROTECTION WORKS AT SUYO- TAGUDIN-SANTA CRUZ NIS, SUYO, ILOCOS SUR |
FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. (11645) |
Region I - Ilocos Region
|
₱14,258,411.70 |
Completed
|
|
116 days
|
|
| 25AD0006
|
PREVENTIVE MAINTENANCE-SECONDARY ROADS- SULVEC PORT RD-K0376+(-744)-K0376+689 |
115 CONSTRUCTION & DEVELOPMENT (38309) |
Region I - Ilocos Region
|
₱15,134,661.28 |
Completed
|
|
47 days
|
|
| 25AC0033
|
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BANTAY, ILOCOS SUR |
SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION (47890) |
Region I - Ilocos Region
|
₱47,500,811.82 |
On-Going
|
|
167 days
|
|
| 25AC0008
|
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY PANTAY AND BARANGAY TAMURONG, CAOAYAN, ILOCOS SUR |
739 BUILDERS (31174) / APP CONSTRUCTION AND SUPPLIES (42160) |
Region I - Ilocos Region
|
₱112,326,000.00 |
On-Going
|
|
227 days
|
|
| 25AC0010
|
CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL - IT), BRGY. VILLAMAR ROAD CONNECTING FISHPONDS IN SUPPORT TO FISH TRADING AND PROC |
JMCQ CONSTRUCTION AND SUPPLY (46831) |
Region I - Ilocos Region
|
₱14,982,396.49 |
Completed
|
|
154 days
|
|
| 25AC0006
|
CONSTRUCTION OF SPUR DIKE AT BANAOANG PIS, BANTAY, ILOCOS SUR |
TRCP CONSTRUCTION (48646) |
Region I - Ilocos Region
|
₱14,115,015.19 |
Completed
|
|
134 days
|
|
| 25AC0064
|
CONSTRUCTION OF ROAD, BARANGAY TAGUIPORO TO BARANGAY RAOIS, BANTAY, ILOCOS SUR |
FIT CONSTRUCTION (35857) |
Region I - Ilocos Region
|
₱19,205,335.09 |
Not Yet Started
|
|
144 days
|
|
| 25AB0117
|
BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES,CONSTRUCTION OF 12 CLASSROOMS - ACADEMIC BUILDING, MARIANO MARCOS STATE UNIVERSITY - CURRIMAO CAMPUS, CURRIMAO, ILOCOS NORTE |
AJ TAYLAN CONSTRUCTION CORPORATION (2336) |
Region I - Ilocos Region
|
₱33,576,108.50 |
On-Going
|
|
195 days
|
|
| 25AB0172
|
BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, (EVACUATION CENTER) BRGY. SAN NICOLAS, SAN NICOLAS ILOCOS NORTE |
VCD CONSTRUCTION (13949) / ASIAN PEARL CONSTRUCTION & DEVT. CORP. (9059) |
Region I - Ilocos Region
|
₱38,409,378.73 |
On-Going
|
|
260 days
|
|
| 25AB0104
|
BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES , CONSTRUCTION OF ROAD INCLUDING DRAINAGE STRUCTURE, MARIANO MARCOS STATE UNIVERSITY - CASAT CAMPUS, CURRIMAO, ILOCOS NORTE |
ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) |
Region I - Ilocos Region
|
₱44,104,802.00 |
On-Going
|
|
405 days
|
|
| 25AB0007
|
CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO MADONGAN DAM, MARCOS, ILOCOS NORTE |
TMT CONSTRUCTION (39686) |
Region I - Ilocos Region
|
₱9,582,240.72 |
Not Yet Started
|
|
144 days
|
|
| 25AB0174
|
BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, (EVACUATION CENTER), BRGY. LUMBAD, DINGRAS ILOCOS NORTE |
BJMJB CONSTRUCTION & SUPPLY (44546) / LINEAR CONSTRUCTION CORP. (3575) |
Region I - Ilocos Region
|
₱38,411,982.76 |
Not Yet Started
|
|
260 days
|
|
| 25AA0136
|
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BARANGAY BINSANG, PASUQUIN, ILOCOS NORTE |
HAUSLAND CONSTRUCTION (32378) |
Region I - Ilocos Region
|
₱37,622,683.82 |
Completed
|
|
200 days
|
|
| 25AA0122
|
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANBAN RIVER, BARANGAY BARUYEN, BANGUI, ILOCOS NORTE |
BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY (31564) / TMT CONSTRUCTION (39686) |
Region I - Ilocos Region
|
₱37,646,590.60 |
Completed
|
|
200 days
|
|
| 25AA0065
|
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, SITIO SARSARGUELAS, BARANGAY 34, VINTAR, ILOCOS NORTE |
BJMJB CONSTRUCTION & SUPPLY (44546) |
Region I - Ilocos Region
|
₱37,628,258.22 |
Completed
|
|
186 days
|
|
| 25AA0029
|
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY CABARUAN, BACARRA, ILOCOS NORTE |
MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY (38288) |
Region I - Ilocos Region
|
₱56,409,039.82 |
Completed
|
|
229 days
|
|
| 25AA0025
|
BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - BUAGAO BR. (B00538LZ) ALONG MANILA NORTH RD. |
ZEDIK BUILDERS (33330) |
Region I - Ilocos Region
|
₱42,632,169.31 |
Not Yet Started
|
|
226 days
|
|
| 25A00013
|
RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, GILBERT BR. 2 (B00842LZ) ALONG MANILA NORTH RD. |
ALPHATEC CHEMICAL CORPORATION (39938) |
Region I - Ilocos Region
|
₱140,407,500.00 |
On-Going
|
|
315 days
|
|
| 25A00009
|
CONSTRUCTION OF MISSING LINKS / NEW ROADS, NAGUILIAN-BAGULIN-KAPANGAN ROAD, BAGULIN, LA UNION (PACKAGE 4) |
ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) |
Region I - Ilocos Region
|
₱112,349,031.27 |
On-Going
|
|
270 days
|
|
| 25A00008
|
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG AGNO RIVER, BARANGAY PANACOL, AGUILAR, PANGASINAN, PHASE IV |
ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908) |
Region I - Ilocos Region
|
₱144,942,549.78 |
On-Going
|
|
312 days
|
|
| 25A00132
|
BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HALOG EAST, TUBAO, LA UNION |
VILLAR GENERAL CONSTRUCTION AND SUPPLIES (22540) |
Region I - Ilocos Region
|
₱33,617,484.27 |
Completed
|
|
194 days
|
|
| 25A00097
|
BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER BASIN, PACKAGE 1, BARANGAY ANDUYAN, TUBAO, LA UNION |
VILLAR GENERAL CONSTRUCTION AND SUPPLIES (22540) |
Region I - Ilocos Region
|
₱57,629,893.92 |
Completed
|
|
228 days
|
|
| 25A00440
|
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF CALAOAAN FLOOD CONTROL LEADING OUTFALL TO PARAS-SAN NICOLAS, CANDON CITY, ILOCOS SUR |
NGEC-NESTOR GENERAL ENGINEERING & CONSTRUCTION (34583) |
Region I - Ilocos Region
|
₱18,710,197.21 |
Not Yet Started
|
|
152 days
|
|
| 25HM0021
|
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, LUYANG-POO-LAZI RD - K0020+000 - K0020+850 |
FROY J BUILDERS & SUPPLIES (43675) |
NIR - Negros Island Region
|
₱29,403,440.08 |
On-Going
|
|
155 days
|
|
| 25HM0036
|
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MARIA RIVER (UPSTREAM OF MARIA BRIDGE), PHASE 1 |
FIRST GRANDEUR BUILDERS INC. (FORMERLY: FIRST GRANDEUR BUILDERS) (35388) / FROY J BUILDERS & SUPPLIES (43675) |
NIR - Negros Island Region
|
₱96,485,000.00 |
On-Going
|
|
307 days
|
|
| 25HM0044
|
LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION (COMPLETION) OF DPWH SIQUIJOR DEO BUILDING, MARIA, SIQUIJOR (PHASE 3) |
VIKING CONSTRUCTION & SUPPLIES (18129) |
NIR - Negros Island Region
|
₱48,019,952.87 |
On-Going
|
|
330 days
|
|
| 25HM0055
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TACULING RIVER II, BARANGAY TACULING, LAREN |
QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) (32827) |
NIR - Negros Island Region
|
₱97,019,888.00 |
On-Going
|
|
307 days
|
|
| 25HM0059
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF TUBOD-NAPO-CAN |
UY CONDEV CORPORATION (FORMERLY:UY CONSTRUCTION & (12336) / E.G. & I. CONSTRUCTION CORPORATION (16225) |
NIR - Negros Island Region
|
₱141,855,000.00 |
On-Going
|
|
139 days
|
|
| 25HL0012
|
ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING : PRIMARY ROADS: DUMAGUETE SOUTH RD - K0061 + 828 - K0063 + 424, SIATON, NEGROS ORIENTAL |
MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP. (43834) |
NIR - Negros Island Region
|
₱84,495,191.94 |
Completed
|
|
210 days
|
|
| 25HL0017
|
ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CANAWAY RIVER (DOWNSTREAM |
BCV CONSTRUCTION (52490) |
NIR - Negros Island Region
|
₱43,999,967.06 |
Completed
|
|
210 days
|
|
| 25HL0011
|
ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE : PRIMARY ROADS: DUMAGUETE SOUTH RD - K0009 + 886 - K0010 + 000, K0014 + 528 - K0015 + 746, DAUIN, NEGROS ORIENTAL |
UY CONDEV CORPORATION (FORMERLY:UY CONSTRUCTION & (12336) |
NIR - Negros Island Region
|
₱52,831,000.00 |
Completed
|
|
106 days
|
|
| 25HL0010
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES: CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), MAYABON, ZAMBOANGUITA |
MG CONSTRUCTION (41069) / BCV CONSTRUCTION (52490) |
NIR - Negros Island Region
|
₱48,899,886.02 |
Completed
|
|
209 days
|
|
| 25HL0007
|
ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CANAWAY RIVER (DOWNSTREAM |
MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP. (43834) |
NIR - Negros Island Region
|
₱43,879,500.60 |
Completed
|
|
210 days
|
|
| 25HK0059
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALINDAGAN AND BARANG |
SUPREME MEGA STRUCTURE BUILDERS, INC. (38607) / SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION) (11597) |
NIR - Negros Island Region
|
₱101,051,550.45 |
On-Going
|
|
298 days
|
|
| 25HK0051
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINTS MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-NET LENGHT CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, OKIOT SEAWALL, PHASE II |
S-ANG CONSTRUCTION & GENERAL TRADING, INC. (37149) / C.T. LEONCIO CONSTRUCTION & TRADING (17371) |
NIR - Negros Island Region
|
₱140,218,440.40 |
On-Going
|
|
305 days
|
|
| 25HK0044
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAMOGONG RIVER, BAIS CIT |
PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) |
NIR - Negros Island Region
|
₱101,099,999.99 |
On-Going
|
|
298 days
|
|
| 25HK0018
|
SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG STA. CATALINA - PAMPLONA - TANJAY CITY - K0034+000 - K0046+000 |
ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) (44551) |
NIR - Negros Island Region
|
₱142,493,390.58 |
On-Going
|
|
297 days
|
|
| 25HK0025
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO BUGSOK FALLS, MABINAY, NEGROS ORIENTAL |
VESA ENGINEERING AND CONSTRUCTION (32334) |
NIR - Negros Island Region
|
₱9,896,000.00 |
Completed
|
|
60 days
|
|
| 25HJ0156
|
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ROAD WIDENING ALONG PRIMARY ROAD - DUMAGUETE NORTH ROAD (JCY BAIS - KABANKALAN - NEGROS OCC BDRY) K0125+380 - K0125+719, K0125+933 - K0126+933, GUIHULNGAN CITY, NEGROS ORIENTAL |
JM COLLERA KONSTRACT (42258) |
NIR - Negros Island Region
|
₱75,900,096.43 |
On-Going
|
|
237 days
|
|
| 25HJ0142
|
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING - PRIMARY ROADS- DUMAGUETE NORTH RD. (JCT. BAIS-KABANKALAN-NEGROS OCC BDRY) - K0120+300 - K0121+820, GUIHULNGAN CITY, NEGROS ORIENTAL |
MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP. (43834) |
NIR - Negros Island Region
|
₱84,572,910.27 |
On-Going
|
|
253 days
|
|
| 25HJ0004
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DOMOLOG RIVER, BINDOY, NEGROS ORIENTAL |
ANDROMEDA CONSTRUCTION SERVICES AND SUPPLY (41609) / NALE CONSTRUCTION (18552) |
NIR - Negros Island Region
|
₱38,690,515.47 |
On-Going
|
|
208 days
|
|
| 25HJ0151
|
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -IMPROVEMENT OF AQUINO- LUMAPAO ROAD, CANLAON CITY, NEGROS ORIENTAL |
ZMA I CONSTRUCTION & SUPPLY (41198) |
NIR - Negros Island Region
|
₱14,680,561.49 |
Completed
|
|
86 days
|
|
| 25HJ0133
|
ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS DUMAGUETE NORTH RD (JCT BAIS-KABANKALAN-NEGROS OCC BDRY) - K0066+068 - K0066+653, K0069+100 - K00 |
4ANGLE CONSTRUCTION (44838) |
NIR - Negros Island Region
|
₱16,183,367.35 |
Completed
|
|
179 days
|
|
| 25RE0006
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG JCT NATL RD SAGAY-BATO-DIAN-AY-MARCELO-BALEA JCT RD (S00426NR) - K0103 + 083 - K0104 + 000, K0112 + 000 - K0114 + 000, K0121 + 435 - K0122 + 106 |
RKVT CONSTRUCTION (54400) / WTG CONSTRUCTION & DEVELOPMENT CORPORATION (7494) |
NIR - Negros Island Region
|
₱96,296,217.19 |
On-Going
|
|
139 days
|
|
| 25GQ0006
|
ROAD WIDENING ALONG BACOLOD NORTH RD (S00425NR) - K0135+898 - K0139+053 |
KENNETH CONSTRUCTION AND GENERAL MERCHANDISE (33441) |
NIR - Negros Island Region
|
₱100,886,247.12 |
On-Going
|
|
266 days
|
|
| 25GQ0003
|
RECONSTRUCTION TO CONCRETE PAVEMENT ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD (S00427NR) - K0070+332 - K0070+807 |
JVC TOUGH CORE CONSTRUCTION & BUILDERS CORP. (43493) |
NIR - Negros Island Region
|
₱11,114,020.29 |
Completed
|
|
92 days
|
|
| 25GQ0012
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG JCT NATL RD SAGAY-BATO-DIAN-MARCELO-BALEA JCT RD (S00426NR) - K0105+367 - K0105+875 |
HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E (14725) |
NIR - Negros Island Region
|
₱13,219,196.04 |
Completed
|
|
54 days
|
|
| 25GQ0036
|
CONSTRUCTION OF ROAD, BARANGAY CODCOD TO BARANGAY QUEZON, SAN CARLOS CITY, NEGROS OCCIDENTAL |
RKVT CONSTRUCTION (54400) |
NIR - Negros Island Region
|
₱19,595,668.11 |
Completed
|
|
105 days
|
|
| 25GN0002
|
ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BACOLOD SOUTH ROAD (OLD ROAD) - K0019+(-184) - K0020+200, K0020+768 - K0020+948 |
SILVER DRAGON CONSTRUCTION & LUMBER & GLASS SUPPLY INC. (30835) |
NIR - Negros Island Region
|
₱66,873,897.94 |
On-Going
|
|
118 days
|
|
| 25GN0035
|
CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE, BARANGAY POBLACION, VALLADOLID, NEGROS OCCIDENTAL |
R.A. CONSTRUCTION DEVELOPMENT CORPORATION (FORMERLY: R.A. CONSTRUCTION & GENERAL MERCHANDISE) (33060) |
NIR - Negros Island Region
|
₱96,474,108.67 |
On-Going
|
|
318 days
|
|
| 25GN0079
|
CONSTRUCTION OF SHORELINE PROTECTION ALONG GUIMARAS STRAIT - BRGY. ZONE 1, PULUPANDAN, NEGROS OCCIDENTAL |
LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) |
NIR - Negros Island Region
|
₱98,949,706.61 |
On-Going
|
|
363 days
|
|
| 25GN0001
|
INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BACOLOD SOUTH BY-PASS ROAD - K0019+144 - K0020+420 |
JAIME B. CHING ENTERPRISES (4256) |
NIR - Negros Island Region
|
₱14,519,279.59 |
Completed
|
|
76 days
|
|
| 25GM0014
|
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG HILABANGAN RIVER, KABANKALAN CITY, NEGROS OCCIDENTAL |
JAIME B. CHING ENTERPRISES (4256) |
NIR - Negros Island Region
|
₱109,515,920.00 |
On-Going
|
|
245 days
|
|
| 25GM0011
|
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ILOG - BUNGOL RIVER, ILOG, NEGROS OCCIDENTAL |
M.K.U. CONSTRUCTION AND SUPPLY (37674) |
NIR - Negros Island Region
|
₱96,500,000.00 |
On-Going
|
|
282 days
|
|
| 25GM0002
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - KABANKALAN JCT. SALONG-TAPI-DACONGCOGON-BANTAYAN RD - K0104+642 - K0104+773, K0104+802 - K0105+601, KABANKALAN CITY, NEGROS OCCIDENTAL |
HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E (14725) |
NIR - Negros Island Region
|
₱26,938,240.00 |
Completed
|
|
155 days
|
|
| 25GM0001
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - KABANKALAN JCT. SALONG-TAPI-DACONGCOGON-BANTAYAN RD - K0102+000 - K0103+282, KABANKALAN CITY, NEGROS OCCIDENTAL |
HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E (14725) |
NIR - Negros Island Region
|
₱36,671,600.00 |
Completed
|
|
191 days
|
|
| 25RC0006
|
PREVENTIVE MAINTENNCE OF ROAD: ASPHALT OVERLAY-KABANKALAN-BAIS RD (S00240NR) K0096+987-K0099+000 |
HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E (14725) |
NIR - Negros Island Region
|
₱97,949,199.82 |
Completed
|
|
147 days
|
|
| 25GL0100
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY -VALLEHERMOSO-CANLAON CITY-LA CASTELLANA RD - K0076+500 -K0079+132 |
UY CONDEV CORPORATION (FORMERLY:UY CONSTRUCTION & (12336) |
NIR - Negros Island Region
|
₱96,499,781.64 |
On-Going
|
|
223 days
|
|
| 25GL0093
|
CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (DOWNSTREAM OF ALICANTE BRIDGE) ALONG JCT BAGONAWA - LA CASTELLANA - ISABELA RD, LEFT BANK, STA 30+030 - 30+180, NEGROS OCCIDENTAL |
LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) |
NIR - Negros Island Region
|
₱98,959,830.15 |
On-Going
|
|
223 days
|
|
| 25GL0001
|
RECONSTRUCTION TO CONCRETE PAVEMENT - BINALBAGAN-ISABELA RD - K0064 + 000 - K0064 + 1090 |
R.A. CONSTRUCTION DEVELOPMENT CORPORATION (FORMERLY: R.A. CONSTRUCTION & GENERAL MERCHANDISE) (33060) |
NIR - Negros Island Region
|
₱28,911,900.00 |
Completed
|
|
153 days
|
|
| 25GL0002
|
RECONSTRUCTION TO CONCRETE PAVEMENT - HINIGARAN-ISABELA RD K0067 + 424 - K0068 + 517 |
KENNETH CONSTRUCTION AND GENERAL MERCHANDISE (33441) |
NIR - Negros Island Region
|
₱31,798,060.00 |
Completed
|
|
136 days
|
|
| 25GL0060
|
CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION STRUCTURE DOWNSTREAM (LEFT BANK) OF BINALBAGAN (BAGACAY) BRIDGE, BARANGAY RUMIRANG, ISABELA, NEGROS OCCIDENTAL |
LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) |
NIR - Negros Island Region
|
₱96,500,000.00 |
Completed
|
|
224 days
|
|
| 25GK0112
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD - K0088 + 596 - K0091 + 537 |
KENNETH CONSTRUCTION AND GENERAL MERCHANDISE (33441) / WTG CONSTRUCTION & DEVELOPMENT CORPORATION (7494) |
NIR - Negros Island Region
|
₱144,013,626.56 |
On-Going
|
|
162 days
|
|
| 25GK0111
|
CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH ESPLANADE OF HIMOGA-AN RIVER, SAGAY CITY, NEGROS OCCIDENTAL |
JAIME B. CHING ENTERPRISES (4256) / ESJ AND SONS CONSTRUCTION & CONSTRUCTION SUPPLY, INC. (FORM.:ALFIE'S CONST. &CONST. SUPPLY, INC.) (17162) |
NIR - Negros Island Region
|
₱143,026,453.35 |
On-Going
|
|
344 days
|
|
| 25GK0133
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD K0049 + 366 - K0050 + 616, K0081 + 558 - K0081+842, K0085 + 487 - K0086 + 358 |
ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400) |
NIR - Negros Island Region
|
₱142,475,989.84 |
On-Going
|
|
162 days
|
|
| 25GK0077
|
REHABILITATION OF SANTA CRUZ BRIDGE, BARANGAY 20, VICTORIAS CITY, NEGROS OCCIDENTAL |
XA CONSTRUCTION (51548) |
NIR - Negros Island Region
|
₱14,402,996.50 |
Completed
|
|
108 days
|
|
| 25GK0030
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD - K0036 + 000 - K0036 + 902 |
HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E (14725) |
NIR - Negros Island Region
|
₱42,610,653.48 |
Completed
|
|
101 days
|
|
| 25GO0141
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY BACOLOD CIRCUMFERENTIAL RD - K0003 + (-535) - K0006 +000 |
IBC INTERNATIONAL BUILDERS CORPORATION (8576) |
NIR - Negros Island Region
|
₱141,619,951.94 |
On-Going
|
|
210 days
|
|
| 25GO0122
|
PREVENTIVE MAINTENANCE OF ROAD- ASPHALT OVERLAY BACOLOD CIRCUMFERENTIAL RD - K0007 + 634 K0008 +000, K 8+000- K0008+ 414 , K0008+ 414 -K0008+484, K0008+484 - K0008 + 634 |
HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E (14725) |
NIR - Negros Island Region
|
₱44,037,133.65 |
Completed
|
|
64 days
|
|
| 25GO0091
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY, BACOLOD-SN CARLOS RD (S00093NR) -K0005 + (-1083) - K0005 + 000, K0007 + 000 - K0008 + 000, K0009 + 000 - K0009 + 383 |
IBC INTERNATIONAL BUILDERS CORPORATION (8576) |
NIR - Negros Island Region
|
₱48,170,037.97 |
Completed
|
|
67 days
|
|
| 25GO0004
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD CIRCUMFERENTIAL RD - K0003 + (-543) - K0003 + (-222), K0004 + 050 - K0004 + 811 |
IBC INTERNATIONAL BUILDERS CORPORATION (8576) |
NIR - Negros Island Region
|
₱48,740,000.00 |
Completed
|
|
103 days
|
|
| 25GO0002
|
PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD-SN CARLOS RD - K0005 + 000 - K0005 + 903 |
IBC INTERNATIONAL BUILDERS CORPORATION (8576) |
NIR - Negros Island Region
|
₱42,620,000.00 |
Completed
|
|
85 days
|
|
| 25R00002
|
BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, VICTORIAS CITY, NEGROS OCCIDENTAL |
ESJ AND SONS CONSTRUCTION & CONSTRUCTION SUPPLY, INC. (FORM.:ALFIE'S CONST. &CONST. SUPPLY, INC.) (17162) |
NIR - Negros Island Region
|
₱132,439,509.21 |
On-Going
|
|
302 days
|
|
| 25H00053
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SEAWALL, BARANGAY NORTH POBLACION, JIMALALUD, NEGROS ORIENTAL |
PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) |
NIR - Negros Island Region
|
₱149,649,360.00 |
On-Going
|
|
360 days
|
|
| 25H00051
|
CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL |
WTG CONSTRUCTION & DEVELOPMENT CORPORATION (7494) |
NIR - Negros Island Region
|
₱149,364,800.00 |
On-Going
|
|
360 days
|
|
| 25G00070
|
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MINULU- AN RIVER (BOTHSTREAM) AT BACOLOD NORTH RD, TALISAY CITY, NEGROS OCCIDENTAL |
HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E (14725) |
NIR - Negros Island Region
|
₱179,682,935.50 |
On-Going
|
|
397 days
|
|
| 25G00062
|
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ILOG- HILABANGAN RIVER (DOWNSTREAM OF APPROACH A OF ILOG BR.), ILOG, NEGROS OCCIDENTAL |
HOMEWORLD CONSTRUCTION CORP. (FORMERLY HOMEWORLD E (14725) |
NIR - Negros Island Region
|
₱181,514,091.88 |
On-Going
|
|
366 days
|
|
| 25OH0093
|
RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LIWASANG BONIFACIO WEST OVERPASS (FLYOVER) (B01348LZ), MANILA CITY |
EIGHT J'S CONSTRUCTION SERVICES (41912) |
NCR - National Capital Region
|
₱145,235,954.84 |
On-Going
|
|
210 days
|
|
| 25OH0100
|
INSTALLATION OF SOLAR LED STREETLIGHTS WITHIN BARANGAYS 649 TO 828, PRES. QUIRINO AVE (FROM TAFT AVE. TO SOUTH SUPERHIGHWAY), SOUTH SUPERHIGHWAY (FROM ZOBEL ROXAS ST. TO P. QUIRINO AVE), P. FAURA ST. (SAN MARCELINO ST. TO ROXAS BLVD.), ESCODA ST. |
AL-AMEN BUILDERS (36458) |
NCR - National Capital Region
|
₱145,235,075.44 |
On-Going
|
|
240 days
|
|
| 25OH0122
|
CONSTRUCTION OF CUTCUT PUMPING STATION, PASAY CITY (PHASE 1) |
E. F. CHUA CONSTRUCTION, INC. (37826) |
NCR - National Capital Region
|
₱283,333,436.98 |
On-Going
|
|
480 days
|
|
| 25OH0013
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A.11239 PREVENTIVE MAINTENANCE-SECONDARY ROADS ALONG SOUTH SUPER H-WAY-K0004+(-260)-K0004+895 |
AARCON BUILDERS (28336) |
NCR - National Capital Region
|
₱48,578,750.59 |
Completed
|
|
91 days
|
|
| 25OH0006
|
OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS/FLOOD MGMT. PROGRAM/CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF BOOSTER PUMPING STATION ALONG ESTERO DE TRIPA DE GALLINA ALONG PEDRO GIL ST. BRGY. 869,MANILA CITY, PHASE II |
ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) / JCA CONSTRUCTION AND CONSTRUCTION SUPPLY (39026) |
NCR - National Capital Region
|
₱137,222,334.81 |
Completed
|
|
210 days
|
|
| 25OG0027
|
REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE LXVI), QUEZON CITY |
YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. (45002) |
NCR - National Capital Region
|
₱145,509,402.59 |
On-Going
|
|
350 days
|
|
| 25OG0090
|
REHABILITATION OF ROAD AT BARANGAY MARIANA, QUEZON CITY |
MANCOL CONSTRUCTION CORPORATION (44334) |
NCR - National Capital Region
|
₱48,014,467.45 |
Completed
|
|
230 days
|
|
| 25OG0012
|
PREVENTIVE MAINTENANCE - SECONDARY ROADS: COMMONWEALTH AVE - K0013 + (-537) - K0013 + 100, QUEZON CITY |
E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION & TRADING (31406) |
NCR - National Capital Region
|
₱57,733,454.01 |
Completed
|
|
136 days
|
|
| 25OG0134
|
REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES: LAMBINGAN BR. (B02336LZ) ALONG AURORA BLVD, QUEZON CITY |
EIGHT J'S CONSTRUCTION SERVICES (41912) / JROSWELL CONSTRUCTION SERVICES (58146) |
NCR - National Capital Region
|
₱70,909,451.32 |
Not Yet Started
|
|
214 days
|
|
| 25OG0133
|
CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 2, V. LUNA HOSPITAL COMPOUND, QUEZON CITY |
AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574) |
NCR - National Capital Region
|
₱145,521,150.81 |
Not Yet Started
|
|
305 days
|
|
| 25OF0091
|
IMPROVEMENT OF ROAD AT BARANGAY FAIRVIEW, QUEZON CITY |
LE BRON CONSTRUCTION (32219) |
NCR - National Capital Region
|
₱94,762,793.95 |
On-Going
|
|
342 days
|
|
| 25OF0059
|
CONSTRUCTION OF MULTI-PURPOSE BUILDING (BUILDING 1), BARANGAY BAHAY TORO, QUEZON CITY |
DUMDUMA CONSTRUCTION AND TRADING CORPORATION (37256) |
NCR - National Capital Region
|
₱122,512,138.55 |
On-Going
|
|
360 days
|
|
| 25OF0042
|
CONSTRUCTION OF KATIPUNAN AVENUE EXTENSION STA. 1+200 - STA. 1+300, STA. 5+020 - STA. 5+702.62, QUEZON CITY |
C & F CONSTRUCTION & DEVELOPMENT CORPORATION (3509) |
NCR - National Capital Region
|
₱129,687,676.80 |
On-Going
|
|
360 days
|
|
| 25OF0090
|
PREVENTIVE MAINTENANCE - TERTIARY ROADS - PAYATAS RD - K0024+000 - K0025+500, QUEZON CITY |
E.L. ANOLIN CONSTRUCTION (35406) |
NCR - National Capital Region
|
₱59,094,104.35 |
Completed
|
|
105 days
|
|
| 25OF0037
|
PREVENTIVE MAINTENANCE - SECONDARY ROADS - A BONIFACIO AVE - K0006+(-348) - K0007+280, QUEZON CITY |
L.R. TIQUI BUILDERS, INC. (13810) |
NCR - National Capital Region
|
₱95,524,991.99 |
Completed
|
|
210 days
|
|
| 25OE0021
|
RETROFITTING OF MULTI-PURPOSE BUILDING, ISABELO DELOS REYES ELEMENTARY SCHOOL, MANILA CITY |
JELSIE CONSTRUCTION & SUPPLY (44943) |
NCR - National Capital Region
|
₱145,824,928.37 |
On-Going
|
|
240 days
|
|
| 25OE0012
|
REHABILITATION OF ROAD WITH DRAINAGE STRUCTURE WITHIN ZONE 58 TO 67, MANILA CITY |
JIIK CONSTRUCTION SERVICES (50966) |
NCR - National Capital Region
|
₱136,558,062.87 |
Completed
|
|
300 days
|
|
| 25OE0040
|
INSTALLATION OF PUMP ACCESSORIES ALONG ESTERO DE SAN MIGUEL, MANILA CITY |
EIGHT J'S CONSTRUCTION SERVICES (41912) / MNJAP CONSTRUCTION SERVICES (56648) |
NCR - National Capital Region
|
₱142,144,438.69 |
Completed
|
|
150 days
|
|
| 25OE0073
|
REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 5), MANILA CITY |
ALRIE CONSTRUCTION SERVICES (54139) |
NCR - National Capital Region
|
₱101,129,961.57 |
Completed
|
|
134 days
|
|
| 25OE0078
|
REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 3), MANILA CITY |
ALRIE CONSTRUCTION SERVICES (54139) |
NCR - National Capital Region
|
₱141,843,652.14 |
Completed
|
|
169 days
|
|
| 25OD0019
|
CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF CREEKS, BARANGAY 166, (PHASE 4), CALOOCAN CITY |
PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST. (2852) |
NCR - National Capital Region
|
₱48,108,830.58 |
Completed
|
|
210 days
|
|
| 25OD0018
|
CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF CREEKS, PHASE 8, BARANGAY 176, CALOOCAN CITY |
KING EIGHT BUILDERS AND SUPPLY (37325) |
NCR - National Capital Region
|
₱89,834,806.92 |
Completed
|
|
300 days
|
|
| 25OD0043
|
CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF CREEKS, BARANGAY 171 TIERA NOVA, CALOOCAN CITY |
KING EIGHT BUILDERS AND SUPPLY (37325) / KING SKY BUILDERS AND SUPPLY INC., FORMERLY (KING EIGHT BUILDERS AND SUPPLY INC.) (53938) |
NCR - National Capital Region
|
₱89,839,600.64 |
Completed
|
|
210 days
|
|
| 25OD0036
|
CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF MATARIK, BARANGAY 176 (PHASE 3), CALOOCAN CITY |
PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST. (2852) |
NCR - National Capital Region
|
₱89,931,184.37 |
Completed
|
|
300 days
|
|
| 25OD0034
|
CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS B SERRANO ST - K0010 + (-330) - K0010 + 1065 |
J. SIMEON CONSTRUCTION (31867) / KING CLOVER CONSTRUCTION INC. (57120) |
NCR - National Capital Region
|
₱94,482,662.95 |
On-Going
|
|
240 days
|
|
| 25OC0120
|
CONSTRUCTION OF DRAINAGE MAIN ALONG DR. A. SANTOS AVENUE, DISTRICT 1,PARAÑAQUE CITY, METRO MANILA |
R.D. TALENS CONSTRUCTION AND TRADING (36817) |
NCR - National Capital Region
|
₱141,857,411.34 |
On-Going
|
|
360 days
|
|
| 25OC0122
|
CONSTRUCTION OF REVETMENT ALONG FISHERMANS WHARF, BRGY. LA HUERTAPARAÑAQUE CITY, METRO MANILA |
K84 CONSTRUCTION AND DEVELOPMENT CORPORATION (51671) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722) |
NCR - National Capital Region
|
₱127,880,582.84 |
On-Going
|
|
360 days
|
|
| 25OC0112
|
ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-PARAÑAQUE-SUCAT RD--K0018+030-K0018+238PARAÑAQUE CITY, METRO MANILA |
GOLDEN 3T CONSTRUCTION CORPORATION (FORMERLY:GOLDEN 3T CONSTRUCTION) (33002) |
NCR - National Capital Region
|
₱13,031,147.05 |
Completed
|
|
60 days
|
|
| 25OC0060
|
ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SOUTH SUPER H-WAY WEST SERVICE RD-K0016 + 462 - K0016 + 789PARAÑAQUE CITY, METRO MANILA |
GOLDEN 3T CONSTRUCTION CORPORATION (FORMERLY:GOLDEN 3T CONSTRUCTION) (33002) |
NCR - National Capital Region
|
₱7,490,894.22 |
Completed
|
|
30 days
|
|
| 25OC0014
|
ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS-AIRPORT RD-(S03332LZ) CHAINAGE 063-CHAINAGE 518,PARAÑAQUE CITY, METRO MANILA |
AARCON BUILDERS (28336) |
NCR - National Capital Region
|
₱18,507,688.77 |
Completed
|
|
150 days
|
|
| 25OB0236
|
CONSTRUCTION OF TAGUIG GENERAL HOSPITAL (PHASE 12), TAGUIG CITY |
THAISON BUILDER AND DEVELOPER INC. (36639) |
NCR - National Capital Region
|
₱96,020,128.95 |
Completed
|
|
300 days
|
|
| 25OB0239
|
RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - C5/ORTIGAS FLYOVER (B03318LZ) ALONG C5 - ORTIGAS FLYOVER |
KING SKY BUILDERS AND SUPPLY INC., FORMERLY (KING EIGHT BUILDERS AND SUPPLY INC.) (53938) / C.T. LEONCIO CONSTRUCTION & TRADING (17371) |
NCR - National Capital Region
|
₱96,500,000.00 |
Completed
|
|
270 days
|
|
| 25OB0243
|
RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - C5/SAMPAGUITA EAST & WEST INTERCHANGE (B04747LZ) ALONG C5/SAMPAGUITA EAST & WEST INTERCHANGE |
DRJY CONSTRUCTION (53814) / C.T. LEONCIO CONSTRUCTION & TRADING (17371) |
NCR - National Capital Region
|
₱96,497,560.59 |
Completed
|
|
270 days
|
|
| 25OB0244
|
RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - C5/SAMPAGUITA WEST RAMP ON RD (B04751LZ) ALONG C5/SAMPAGUITA WEST RAMP ON R |
WAWAO BUILDERS (46535) / C.T. LEONCIO CONSTRUCTION & TRADING (17371) |
NCR - National Capital Region
|
₱93,604,915.38 |
Completed
|
|
250 days
|
|
| 25OB0308
|
CONSTRUCTION (COMPLETION) OF NACIDA INCUBATOR FACILITY INCLUDING SITE DEVELOPMENT, BARANGAY CONCEPCION DOS, PHASE IV MARIKINA CITY |
JK2CS CONSTRUCTION AND TRADING CORPORATION (40972) / AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129) |
NCR - National Capital Region
|
₱94,569,345.07 |
Completed
|
|
210 days
|
|
| 25OA0008
|
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 5, BARANGAY TAÑONG TO BARANGAY DAMPALIT, MALABON CITY |
WAWAO BUILDERS (46535) |
NCR - National Capital Region
|
₱96,001,714.06 |
On-Going
|
|
300 days
|
|
| 25OA0095
|
REHABILITATION (COMPLETION) OF BANGKULASI PUMPING STATION, NAVOTAS CITY |
ANORE CONSTRUCTION (34048) |
NCR - National Capital Region
|
₱236,349,929.24 |
On-Going
|
|
360 days
|
|
| 25OA0032
|
REHABILITATION OF BRIDGE, LAPU-LAPU BRIDGE, BARANGAY NBBS KAUNLARAN, NAVOTAS CITY |
MCORR CONSTRUCTION (43404) |
NCR - National Capital Region
|
₱19,204,035.88 |
Completed
|
|
180 days
|
|
| 25OA0044
|
REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SOUTH PINAGKABALIAN RIVER (PHASE 4), MALABON CITY |
ROTAFLEX CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY:ROTA FLEX CONSTRUCTION) (23408) |
NCR - National Capital Region
|
₱28,512,571.82 |
Completed
|
|
240 days
|
|
| 25OA0041
|
REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SOUTH PINAGKABALIAN RIVER (PHASE 1), MALABON CITY |
E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION & TRADING (31406) |
NCR - National Capital Region
|
₱50,522,417.27 |
Completed
|
|
270 days
|
|
| 25OI0079
|
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ZAPOTE RIVER UPSTREAM AND ITS TRIBUTARIES, LAS PINAS CITY |
E. F. CHUA CONSTRUCTION, INC. (37826) |
NCR - National Capital Region
|
₱98,564,620.58 |
On-Going
|
|
270 days
|
|
| 25OI0114
|
CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND OTHER IMPROVEMENTS AT BARANGAYS TALON 1 TO TALON 3, LAS PINAS CITY |
I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR (10410) |
NCR - National Capital Region
|
₱218,293,466.80 |
On-Going
|
|
330 days
|
|
| 25OI0075
|
CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALABANG - ZAPOTE DIVERSION ROAD (FROM ALABANG - ZAPOTE FLYOVER TO C5 BRIDGE), LAS PINAS CITY |
I&E CONSTRUCTION CORPORATION (FORMERLY: I&E CONSTR (10410) |
NCR - National Capital Region
|
₱114,902,549.30 |
On-Going
|
|
330 days
|
|
| 25OI0006
|
PREVENTIVE MAINTENANCE - SECONDARY ROADS: ZAPOTE - ALABANG RD, K0018+487 - K0019+047, LAS PINAS CITY |
OMNICON BUILDERS (22816) |
NCR - National Capital Region
|
₱45,249,363.18 |
Completed
|
|
60 days
|
|
| 25OI0004
|
PREVENTIVE MAINTENANCE - SECONDARY ROADS: ZAPOTE - ALABANG RD, K0016+440 - K0018+260, LAS PINAS CITY |
OMNICON BUILDERS (22816) |
NCR - National Capital Region
|
₱141,129,954.70 |
Completed
|
|
30 days
|
|
| 25O00082
|
INSTALLATION OF SOLAR STREET LIGHTS ALONG FAIRVIEW AVENUE (DONA CARMEN TO QUIRINO AVENUE), QUEZON CITY |
LE BRON CONSTRUCTION (32219) |
NCR - National Capital Region
|
₱164,978,134.86 |
On-Going
|
|
240 days
|
|
| 25O00107
|
REHABILITATION AND IMPROVEMENT OF RETARDING POND AT TAPAYAN PUMPING STATION AND TRIBUTARIES, PASIG CITY |
E. F. CHUA CONSTRUCTION, INC. (37826) |
NCR - National Capital Region
|
₱189,130,984.39 |
On-Going
|
|
360 days
|
|
| 25O00018
|
RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MAGALLANES FLYOVER (SB) CUBAO-PASAY (B03219LZ) ALONG EPIFANIO DELOS SANTOS AVE (EDSA) (PHASE II) |
LE BRON CONSTRUCTION (32219) |
NCR - National Capital Region
|
₱235,938,823.15 |
On-Going
|
|
420 days
|
|
| 25O00124
|
ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - EPIFANIO DELOS SANTOS AVE (EDSA) - K0029 + 875 - K0028 + 261.50 |
L.R. TIQUI BUILDERS, INC. (13810) / 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923) |
NCR - National Capital Region
|
₱166,437,732.42 |
On-Going
|
|
120 days
|
|
| 25O00113
|
CONSTRUCTION OF SAN ANDRES PUMPING STATION, MANILA (PHASE 2) |
E. F. CHUA CONSTRUCTION, INC. (37826) |
NCR - National Capital Region
|
₱376,792,706.58 |
On-Going
|
|
540 days
|
|
| 25PK0007
|
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: PAVING OF UNPAVED ROADS - SECONDARY ROADS: MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD - K0430+178 - K0430+221, K0430+235 - K0430+310, K0432+445 - K0432+603, K043 |
BANGYAN 3D CONSTRUCTION (48505) / CELESTINO CONSTRUCTION DEVELOPMENT CORPORATION (FORMERLY: JJA CONSTRUCTION & SUPPLY) (22676) |
CAR - Cordillera Administrative Region
|
₱36,254,786.76 |
On-Going
|
|
245 days
|
|
| 25PK0001
|
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS: TERTIARY ROADS: LUBUAGAN-BATONG BUHAY-ABRA BDRY RD. K0476+1882-K0476+2582 |
ABMJ CONSTRUCTION AND AGGREGATES (43285) |
CAR - Cordillera Administrative Region
|
₱34,215,211.37 |
On-Going
|
|
231 days
|
|
| 25PK0005
|
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS / NEW ROADS: ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION, KALINGA) KALINGA. |
BHM CONSTRUCTION (30724) |
CAR - Cordillera Administrative Region
|
₱120,546,739.46 |
On-Going
|
|
352 days
|
|
| 25PK0003
|
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS - TERTIARY ROADS - LUBUAGAN-BATONG BUHAY-ABRA BDRY RD - K0461+854 - K0462+0032, K0464+023 - K0464+123, K0464+211 - K0464+284, K0465+157 |
BHM CONSTRUCTION (30724) / BANGYAN 3D CONSTRUCTION (48505) |
CAR - Cordillera Administrative Region
|
₱139,919,235.31 |
On-Going
|
|
311 days
|
|
| 25PK0024
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG |
HKBT CONSTRUCTION (48936) |
CAR - Cordillera Administrative Region
|
₱4,898,560.00 |
Completed
|
|
82 days
|
|
| 25PM0042
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-CONSTRUCTION OF ROAD, PARACELIS ROXAS ROAD VIA (JCT. MABOLLOG-MABARUTBOT-CARUPAAN-TUPING-ANONAT PROPER SINAMAR SECTION), PARACELIS, MOUNTAIN PROVINCE |
UPLAND CONSTRUCTION AND ENGINEERING SERVICES (34866) |
CAR - Cordillera Administrative Region
|
₱144,750,000.00 |
On-Going
|
|
384 days
|
|
| 25PM0017
|
ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS- JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD - (S04030LZ) CHAINAGE 1680 - CHAINAGE 3448, CHAINAGE 4009 - CHAINAGE 4245 |
PLAJ CONSTRUCTION SERVICES (53427) / A.P.O. GENERAL CONSTRUCTION (7010) |
CAR - Cordillera Administrative Region
|
₱98,243,514.90 |
On-Going
|
|
223 days
|
|
| 25PM0004
|
ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - JCT TALUBIN-BARLIG-NATONIN-CALACCAD RD - K0441 + 041 - K0441+262 |
MG SAMIDAN CONSTRUCTION (33234) |
CAR - Cordillera Administrative Region
|
₱14,694,235.63 |
Completed
|
|
91 days
|
|
| 25PM0019
|
ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS- TERTIARY ROADS - JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD (S03997LZ)- K0427 + 525 - K0427 + 695 |
MG SAMIDAN CONSTRUCTION (33234) |
CAR - Cordillera Administrative Region
|
₱15,654,859.00 |
Completed
|
|
97 days
|
|
| 25PM0013
|
ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - TANUDAN-BARLIG-IFUGAO ROAD (BARLIG-BANAUE SECTION), MOUNTAIN PROVINCE |
LATAWAN EDUARDO AP-O DEVELOPERS CONSTRUCTION SERVICES (55693) |
CAR - Cordillera Administrative Region
|
₱29,400,000.00 |
Completed
|
|
192 days
|
|
| 25PI0060
|
INSTALLATION/ APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MT PROV-CAGAYAN VIA TABUK ENRILE RD, KO392+(-332) - KO396+683 |
BALINTUGAN CONSTRUCTION (34566) |
CAR - Cordillera Administrative Region
|
₱48,509,999.59 |
On-Going
|
|
144 days
|
|
| 25PI0046
|
MT PROVINCE-N VIZCAYA RD- KO363+495 - KO363+554, KO366+465 - KO366+530, KO380+450 - KO380+485 |
ARUNEY CONSTRUCTION (53911) |
CAR - Cordillera Administrative Region
|
₱6,298,221.72 |
Completed
|
|
129 days
|
|
| 25PI0042
|
CONSTRUCTION OF FLOOD CONTROL ALONG CHICO RIVER, FALIWANG-CHICO KARAYAN BRIDGE, BONTOC, MOUNTAIN PROVINCE |
JBA CONSTRUCTION AND BUILDERS (36321) |
CAR - Cordillera Administrative Region
|
₱80,188,000.00 |
On-Going
|
|
249 days
|
|
| 25PI0044
|
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGKUYO-CHICO RIVER, FENGAR, STA. 33+070 -STA. 33+220(RS), PHASE 2, BONTOC, MOUNTAIN PROVINCE |
SADLAN CONSTRUCTION (33550) |
CAR - Cordillera Administrative Region
|
₱9,687,356.00 |
Completed
|
|
72 days
|
|
| 25PI0039
|
CONSTRUCTION OF FLOOD CONTROL STRUCURE ALONG CHICO RIVER, SITIO CHEKA-A, BONTOC, MOUNTAIN PROVINCE |
AFEW CONSTRUCTION (45634) |
CAR - Cordillera Administrative Region
|
₱9,701,999.90 |
Completed
|
|
93 days
|
|
| 25PL0076
|
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - ALIOG BR. (B00977LZ) ALONG MANUEL S. AGYAO BOULEVARD |
OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119) |
CAR - Cordillera Administrative Region
|
₱57,111,888.88 |
On-Going
|
|
305 days
|
|
| 25PL0078
|
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - MANUEL S. AGYAO BOULEVARD - K0510 + 084 - K0510 + 387, K0514 + 549 - K0514 + 789, K0518 + 000 - K0519 + 317, K0525 + 59 |
YUNAKIM CONSTRUCTION (40767) |
CAR - Cordillera Administrative Region
|
₱50,375,288.75 |
On-Going
|
|
210 days
|
|
| 25PL0090
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF ROAD, SEET-MABACA-TALOCTOC-MANGA |
JTM CONSTRUCTION (41136) |
CAR - Cordillera Administrative Region
|
₱77,150,162.12 |
On-Going
|
|
317 days
|
|
| 25PL0101
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG SALTAN RIVER, JUNCTION, |
ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140) |
CAR - Cordillera Administrative Region
|
₱96,488,990.78 |
On-Going
|
|
240 days
|
|
| 25PL0038
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG ALIOG RIVER AT BURAYUCAN, BARANGAY |
ZERO ONE CONSTRUCTION AND SUPPLY (52466) |
CAR - Cordillera Administrative Region
|
₱4,820,919.43 |
Completed
|
|
120 days
|
|
| 25PJ0035
|
25P00J35: BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES-CONSTRUCTION OF ROAD, SITIO MASIKAL, BARANGAY LITTLE TADIAN, ALFONSO LISTA, IFUGAO |
MR-G CONSTRUCTION (51116) |
CAR - Cordillera Administrative Region
|
₱4,949,979.59 |
Completed
|
|
47 days
|
|
| 25PJ0031
|
25PJ0031: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)-ACCESS ROAD LEADING TO AMMUNG FESTIVAL, YAO JIA XI DRAGON FRUIT FARM, DOMINGO |
MR-G CONSTRUCTION (51116) |
CAR - Cordillera Administrative Region
|
₱9,799,967.59 |
Completed
|
|
83 days
|
|
| 25PJ0013
|
25PJ0013: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-ALFONSO LISTA-SAN MANUEL DIVERSION ROAD, IFUGAO |
CJ ALCONS CONSTRUCTION & SUPPLY (37692) |
CAR - Cordillera Administrative Region
|
₱9,799,860.43 |
Completed
|
|
83 days
|
|
| 25PJ0015
|
25PJ0015: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/ NEW ROADS-AGUINALDO-TOBOY-NATONIN ROAD, IFUGAO |
JLY CONSTRUCTION (47847) |
CAR - Cordillera Administrative Region
|
₱16,463,996.94 |
Completed
|
|
125 days
|
|
| 25PJ0024
|
25PJ0024: BRIDGE PROGRAM-RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES-MONGGAYANG BR (B04884LZ) ALONG UBAO-TAANG ROAD |
MA CONSTRUCTION (40584) / R.S. SEPIAN CONSTRUCTION & TRUCKING (20519) |
CAR - Cordillera Administrative Region
|
₱24,499,950.61 |
Completed
|
|
152 days
|
|
| 25PG0016
|
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IBULAO RIVER, STA. 329+250 - STA. 330+000, OLILICON, LAGAWE, IFUGAO |
DJY CONSTRUCTION (35651) / RHOCHESTER BUILDERS (46407) |
CAR - Cordillera Administrative Region
|
₱52,577,355.18 |
On-Going
|
|
240 days
|
|
| 25PG0011
|
KIANGAN-ASIPULO-AMBAGUIO-BAYOMBONG ROAD, IFUGAO, ASIPULO, IFUGAO |
SOUTHLAND CONSTRUCTION AND SUPPLIES (39555) |
CAR - Cordillera Administrative Region
|
₱48,918,020.45 |
On-Going
|
|
267 days
|
|
| 25PG0003
|
REHAB./RECONST'N. OF RDS. W/ SLIPS,SLOPE COLLAPSE & LANDSLIDE ALONG BAN-HUNG-BENG BDRY. RD.-K0400+073-K0400+096,K0402+179-K0402+275,K0403+287-K0403+426,K0404+153-K0404+203,K0405+075-K0405+097,K0405+211-K0405+258,K0406+364-K0406+379,K0407+(-250)-K0407+(-220) |
DJY CONSTRUCTION (35651) |
CAR - Cordillera Administrative Region
|
₱54,248,383.48 |
On-Going
|
|
290 days
|
|
| 25PG0024
|
CONSTRUCTION OF BRIDGE, CADEL SPORT COMPLEX, LAGAWE, IFUGAO |
EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722) |
CAR - Cordillera Administrative Region
|
₱33,951,745.63 |
Not Yet Started
|
|
366 days
|
|
| 25PG0057
|
CONSTRUCTION OF HAPID EVACUATION CENTER (COMPLETION), BARANGAY HAPID, LAMUT, IFUGAO |
BEGAL DESIGN & CONSTRUCTION (34000) |
CAR - Cordillera Administrative Region
|
₱1,968,001.22 |
Completed
|
|
90 days
|
|
| 25PF0031
|
REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS: GOV. BADO DANGWA NATIONAL ROAD - K0291+280 - K0291+430, K0291+670 - K0291+770, K0291+875 - K0292+080, K0291+290 - K0292+364, K0292+405 - K0292+445, K0292+630 - K0292+900, K02 |
FAMILY CIRCLE CONSTRUCTION (32608) |
CAR - Cordillera Administrative Region
|
₱53,183,783.05 |
On-Going
|
|
263 days
|
|
| 25PF0001
|
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER GUEDAY TO BUYAKI SECTION, STA. 8+961 - STA. 9+921 (BS), BUGUIAS, BENGUET |
OLSIM CONSTRUCTION (36105) |
CAR - Cordillera Administrative Region
|
₱64,166,915.97 |
On-Going
|
|
300 days
|
|
| 25PF0007
|
CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES: KING SOLOMON STO. NIÑO-COROZ-TABEYO ROAD IN SUPPORT TO COFFEE, CACAO, BAMBOO CUT FLOWER HEIRLOOM RICE, LIVESTOCK, AND OTHER HIGH VALUE VEGETABLES, TUBLAY, BENGUET |
EFLER CONSTRUCTION AND ENTERPRISE (41046) |
CAR - Cordillera Administrative Region
|
₱4,894,707.00 |
Completed
|
|
113 days
|
|
| 25PF0021
|
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SEBANG COMMUNAL IRRIGATION SYSTEM (CIS), BUGUIAS, BENGUET |
NORJOHN CONSTRUCTION (47891) |
CAR - Cordillera Administrative Region
|
₱14,660,208.06 |
Completed
|
|
168 days
|
|
| 25PF0022
|
CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER DALIGDIG SECTION, STA. 11+904 - STA. 12+444 (BS), BUGUIAS, BENGUET |
ALMOND ENGINEERING & CONSTRUCTION (35225) / KJB SUPPLIES AND CONSTRUCTION SERVICES (53517) |
CAR - Cordillera Administrative Region
|
₱46,044,524.44 |
Completed
|
|
299 days
|
|
| 25PE0017
|
CONSTRUCTION OF DPWH BENGUET 1ST DISTRICT ENGINEERING OFFICE MAIN BUILDING, BENGUET (PHASE IV), LA TRINIDAD, BENGUET |
SEJ CONSTRUCTION & AGGREGATES (36378) |
CAR - Cordillera Administrative Region
|
₱48,998,942.03 |
On-Going
|
|
352 days
|
|
| 25PE0005
|
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER, SECTION 11 (AMBALANGA RIVER SECTION), ITOGON, BENGUET |
UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES (35079) |
CAR - Cordillera Administrative Region
|
₱96,498,937.55 |
On-Going
|
|
291 days
|
|
| 25PE0010
|
RETROFITTING/STRENGTHENING OF BRIDGE - TAAL BR. (B00907LZ) ALONG BENGUET-NUEVA VIZCAYA RD., BOKOD, BENGUET |
TSAI SHEN CONSTRUCTION (54252) |
CAR - Cordillera Administrative Region
|
₱7,347,982.43 |
Completed
|
|
95 days
|
|
| 25PE0020
|
CONSTRUCTION OF CONCRETE ROAD - BAGUIO-BONTOC ROAD JCT. TO GUIWENG-NAWAL-TICKEY-DACLAN ROAD IN SUPPORT OF COFFEE, AND PROCESSED FOOD MEAT INDUSTRIES, BOKOD, BENGUET |
M.P. TABERAO CONSTRUCTION SERVICES AND SUPPLIES (46017) |
CAR - Cordillera Administrative Region
|
₱9,787,270.32 |
Completed
|
|
112 days
|
|
| 25PE0004
|
INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MARCOS HI-WAY - K0268 + 000 - K0273 + 000, TUBA, BENGUET |
UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES (35079) |
CAR - Cordillera Administrative Region
|
₱48,979,741.35 |
Completed
|
|
104 days
|
|
| 25PD0093
|
BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF ROAD, BARANGAY CAMP 7, BAGUIO CITY |
ALEPHNORTH PEAK CONSTRUCTION AND DEVELOPMENT CO. (45344) |
CAR - Cordillera Administrative Region
|
₱4,736,129.43 |
Completed
|
|
120 days
|
|
| 25PD0068
|
BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY SAN ROQUE, BAGUIO CITY |
A.R.J. CIVIL ENGINEERING CONSTRUCTION (48395) |
CAR - Cordillera Administrative Region
|
₱2,900,000.00 |
Completed
|
|
110 days
|
|
| 25PD0060
|
BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (YOUTH AND CHILD DEVELOPMENT CENTER), BARANGAY LOWER ROCK QUARRY, BAGUIO CITY |
A.R.J. CIVIL ENGINEERING CONSTRUCTION (48395) |
CAR - Cordillera Administrative Region
|
₱1,918,000.00 |
Completed
|
|
60 days
|
|
| 25PD0059
|
BASIC INFRASTRUCTURE PROGRAM (BIP) -CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MIDDLE ROCK QUARRY, BAGUIO CITY |
A.R.J. CIVIL ENGINEERING CONSTRUCTION (48395) |
CAR - Cordillera Administrative Region
|
₱2,880,000.00 |
Completed
|
|
125 days
|
|
| 25PD0038
|
BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF ROAD, SUDAYPAN ROAD, BARANGAY UPPER ROCK QUARRY AND SLU-SVP, BAGUIO CITY |
A.R.J. CIVIL ENGINEERING CONSTRUCTION (48395) |
CAR - Cordillera Administrative Region
|
₱4,799,520.00 |
Completed
|
|
125 days
|
|
| 25PC0001
|
ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG - CARASI - CALANASAN ROAD (CALANASAN SIDE), PACKAGE 2, APAYAO |
BHM CONSTRUCTION (30724) |
CAR - Cordillera Administrative Region
|
₱113,484,000.00 |
On-Going
|
|
330 days
|
|
| 25PC0066
|
CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION/IMPROVEMENT OF CALABIGAN-CAGANDUNGAN ROAD, BRGY CAGANDUNGAN & BRGY CALABIGAN, LUNA, APAYAO |
ISNAG BUILDERS & DEV'T. CORPORATION (33781) |
CAR - Cordillera Administrative Region
|
₱66,122,443.76 |
On-Going
|
|
326 days
|
|
| 25PC0015
|
OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 |
ISNAG BUILDERS & DEV'T. CORPORATION (33781) / GOLDRICH CONSTRUCTION & TRADING (16489) |
CAR - Cordillera Administrative Region
|
₱141,829,674.53 |
On-Going
|
|
330 days
|
|
| 25PC0067
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (NCIP PROVINCIAL OFFICE BUILDING), PAYANAN - SAN GREGORIO, LUNA, APAYAO |
J.G. YACAS CONSTRUCTION, SUPPLY AND EQUIPMENT RENTAL (43632) |
CAR - Cordillera Administrative Region
|
₱9,405,071.46 |
Not Yet Started
|
|
366 days
|
|
| 25PC0019
|
CSSP- CONS/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - SAN CARLOS-SAN ANTONIO-NUEVA-MARCELA ROAD LEADING TO BACUT LAKE, STA. MARCELA, APAYAO |
AQUILA CONSTRUCTION CO. (53949) |
CAR - Cordillera Administrative Region
|
₱4,778,128.11 |
Completed
|
|
120 days
|
|
| 25PB0009
|
ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS, CAGAYAN-APAYAO RD (ILI-GUINAMGAMMAN-RIZAL SECT) - K0553 + (-303) - K0555 + 100 |
GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO (9052) |
CAR - Cordillera Administrative Region
|
₱118,313,570.06 |
On-Going
|
|
270 days
|
|
| 25PB0043
|
NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS : PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD - PACKAGE 2 (CONSTRUCTION OF CONCRETE BRIDGE), APAYAO |
PRIME MASTER CONST. AND DEV'T. CORP. (43456) / CAMIA CONST. DEVELOPMENT CORPORATION (FORMERLY:CAM (20506) |
CAR - Cordillera Administrative Region
|
₱141,733,148.29 |
On-Going
|
|
360 days
|
|
| 25PB0012
|
ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE |
OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119) |
CAR - Cordillera Administrative Region
|
₱108,755,500.02 |
On-Going
|
|
415 days
|
|
| 25PB0029
|
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF MATALAG (DOWNSTREAM) FLOOD MITIGATION STRUCTURES, STA.33+288-STA.34+248 |
JOMARCANN GENERAL CONSTRUCTION (30599) |
CAR - Cordillera Administrative Region
|
₱82,029,029.29 |
On-Going
|
|
345 days
|
|
| 25PB0008
|
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AL |
ASC CONSTRUCTION & CONCRETE PRODUCTS (26788) |
CAR - Cordillera Administrative Region
|
₱43,524,844.49 |
On-Going
|
|
230 days
|
|
| 25PA0040
|
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY SAN ANTONIO, BANGUED, ABRA |
MG SAMIDAN CONSTRUCTION (33234) |
CAR - Cordillera Administrative Region
|
₱91,704,044.52 |
On-Going
|
|
301 days
|
|
| 25PA0005
|
CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY MACARCARMAY, BANGUED, ABRA |
SEMBRI CONSTRUCTION (36743) |
CAR - Cordillera Administrative Region
|
₱4,749,377.60 |
On-Going
|
|
147 days
|
|
| 25PA0157
|
RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, LUBLUBNAK BRIDGE (B03229LZ), ALONG ABRA-CERVANTES ROAD, LUBLUBNAK BRIDGE (B03229LZ), ALONG ABRA-CERVANTES ROAD |
TIJ CONSTRUCTION INC. (59160) |
CAR - Cordillera Administrative Region
|
₱18,558,178.62 |
Not Yet Started
|
|
112 days
|
|
| 25PA0129
|
CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), ALAOA TO LAPAT BALANTAY ROAD IN SUPPORT TO CACAO INDUSTRY, TINEG, ABRA |
MG SAMIDAN CONSTRUCTION (33234) |
CAR - Cordillera Administrative Region
|
₱11,456,432.54 |
Not Yet Started
|
|
62 days
|
|
| 25PA0001
|
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRIDGE, SINALANG-PALAO, BANGUED, ABRA, BANGUED, ABRA |
739 BUILDERS (31174) |
CAR - Cordillera Administrative Region
|
₱18,682,040.62 |
On-Going
|
|
192 days
|
|
| 25P00008
|
LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION (COMPLETION) OF DPWH REGIONAL OFFICE CAR OFFICE BUILDING, ENGINEER'S HILL, BAGUIO CITY |
MEP CONSTRUCTION (18759) |
CAR - Cordillera Administrative Region
|
₱47,910,597.38 |
On-Going
|
|
270 days
|
|
| 25P00007
|
SABANGAN BR. (B01414LZ) ALONG CLAVERIA-CALANASAN-KABUGAO RD |
ALPHATEC CHEMICAL CORPORATION (39938) |
CAR - Cordillera Administrative Region
|
₱84,240,818.34 |
On-Going
|
|
338 days
|
|
| 25P00005
|
CONSTRUCTION OF ROAD, DATIL-NANGONUGAN ACCESS, BARANGAY POBLACION, SAGADA, MOUNTAIN PROVINCE |
JAH-ZONE CONSTRUCTION (55024) |
CAR - Cordillera Administrative Region
|
₱9,749,448.75 |
On-Going
|
|
245 days
|
|
| 25P00004
|
CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, SITIO BAYACSAN, BARANGAY TALOY SUR TO BARANGAY TALOY NORTE, TUBA, BENGUET |
TATUM CONSTRUCTION (55191) |
CAR - Cordillera Administrative Region
|
₱9,736,724.76 |
On-Going
|
|
150 days
|
|
| 25P00002
|
CONSTRUCTION OF ROAD, ABINUAN - NATTUM - ALIMIT, MAYOYAO, IFUGAO |
DJY CONSTRUCTION (35651) |
CAR - Cordillera Administrative Region
|
₱57,953,458.96 |
On-Going
|
|
215 days
|
|
| 24Z00029
|
SUB-PROJECT 9 CONTRACT PACKAGE 2, MANUANGAN-PARANG ROAD, CP-2: STA. 7+680 - STA. 10+480 |
CHINA WUYI CO., LTD (OECO_16634) |
Central Office
|
₱1,610,848,037.67 |
Not Yet Started
|
|
1080 days
|
|